Emcon needed to dismantle and relocate a 5 colour printing line as part as a complete factory move, the customer insisted that the machine was cleaned prior to installation which required extra care needed to be taken.

Client Case Study

Emcon needed to dismantle and relocate a 5 colour printing line as part as a complete factory move, the customer insisted that the machine was cleaned prior to installation which required extra care needed to be taken when marking up parts and making sure no electrical components were exposed.

We used a gantry to split the machine and then loaded using a forklift truck. Ice was insisted on being used to clean the machine and produced fantastic results.